Status
Commissioned
Area of the plant
8.5 sq. km.
Duration
23 months
Homes powered
90,000
Covering the
demand of
90,000 people
Number of people
who worked on the
project
5,000
Number of panels
3,200,000
Safe man-hours
5,000,000
Carbon emissions
saved annually
10,00,000 tCO2 saved annually
Turnkey EPC
World’s largest single-site solar project
The largest plant built by Sterling and Wilson Renewable Energy Limited
East-West configuration of modules with unique eight high fixed structure design used to optimise power generation
Among the world's most competitive tariffs
1,412 robots used (at a button’s click) to reduce water consumption and operating expenses
Installed 200 MWp within a short span of one month