Status
Commissioned
Duration
4 months
Homes powered
40,000
Number of people
who worked on the
project
500
Turnkey EPC
Deployed a three-legged module, mounting the structure with a combination of concrete ballast and pilling foundations to make the project site flood resistant
Conducted a detailed flood analysis and installed outdoor inverter stations with RCC beams to tackle the soft, mushy soil