Status
Commissioned
Area of the plant
Water Area- 14,608 m² Used Area-8,995 m² Coverage Ratio-27.70%
Duration
3 months
Number of people
who worked on the
project
30
Number of panels
1,316
Turnkey EPC
The design was based on a pond shape
Imported part material from Taiwan/Vietnam
Materials arranged from IOCL within 3 days
Shore anchoring done with AAI norms
Other information
Experience in the proven technology which is used world wide
Reduction in water evaporation
Extra performance benefits