450 kWp Solar Power Plant,
Kerala, India

  • Status

    Commissioned

  • Area of the plant

    Water Area- 14,608 m² Used Area-8,995 m² Coverage Ratio-27.70%

  • Duration

    3 months

  • Number of people
    who worked on the
    project

    30

  • Number of panels

    1,316

  • Scope of Work

    Turnkey EPC

  • Key Highlights

    The design was based on a pond shape

    Imported part material from Taiwan/Vietnam

    Materials arranged from IOCL within 3 days

    Shore anchoring done with AAI norms

  • Other information

    Experience in the proven technology which is used world wide

    Reduction in water evaporation

    Extra performance benefits

  • Business Vertical

    Floating Solar