Nampala Gold Mines, Mali

  • Status

    Commissioned

  • Carbon emissions
    saved annually

    6,000 tCO2 annually

  • Scope of Work

    Turnkey EPC of 3.85 MWp Solar PV + 2.58 MWhr BESS integration into existing DG Network

  • Challenges

    Extreme remote location of a mine with a completely off-grid solution

    Integration with 6 existing DGs currently in operation

    Single Axis Tracker and Bifacial Modules used to increase the PV generation in the available land area and footprint

  • Key Highlights

    Saving 2 Mn Liter of diesel per annum which is 30% of the client’s diesel consumption per year

    Reduction of Carbon 6000 Ton of CO2 per annum

    Mobile design of the plant, equipment can be moved to another location after 5 years

  • Business Vertical

    Hybrid and Energy Storage